The Material Planner will provide direction and assistance to work group in order to meet assigned objectives.
In this role, you will work within defined parameters to make decisions, apply concepts to issues of moderate complexity, and resolve issues through immediate action or short-term planning.
Coordinate and execute scheduling activities for assigned part numbers using advanced planning system
Assure that the shop has the necessary materials, configuration records, manpower, and tooling to meet required manufacturing / production levels
Establish process for Firm demand loading in ERP.
Collaborate between Product Line and Finance to understand Forecasted Revenue / COGS and ensure Delivery Tickets are appropriate date managed.
Coordinate input on material shortages, farm out, and delivery of hardware
Identify and react to material plans that do not meet customer requirements
Monitor implementation of corrective action plans
Provide effective scheduling and implementation of all programs based on the Master Schedule, cycle time, shop capacity, hardware / tooling availability, and status to schedules
Monitor supply and demand misalignment using advanced planning system, and collaborate with manufacturing sources to implement corrective action plans
Act as a focal point and monitor assigned areas to ensure hardware and subassemblies’ delivery dates meet production needs
Coordinate the efforts of cross-functional groups and across shifts to resolve bottlenecks, parts shortages, machine maintenance, manpower issues, and shop capacity
Work with shop management to develop hardware delivery commitments
Assure timely shipments to all customers and prepare and implement work orders and plans as required
Interface with demand management, shop scheduling, fulfillment team, configuration control, supply sources, customer service reps and other GE organizations as required
Maintain accurate trace ability for all records created during manufacturing of products and ICR transfers
Analyze and measure the current production status and identify problem areas that inhibit full schedule realization
Analyze data to determine opportunities to decrease inventory, improve customer service levels and reduce total costs.
Requirements
Bachelor’s degree from an accredited university or college (or a high school diploma / GED with at least 3years of experience in a Material Planning capacity)
At least 1 additional year of experience in utilizing planning systems
Ability to manage multiple tasks and establish effective work priorities
Prior experience in production control or planning, supervision, sourcing or material control environment