Do you think you have what it takes to be a part of a signature project of this administration?
The signature project is the Ajaokuta-Kaduna-Kano (AKK) Natural Gas Pipeline project.
Responsibilities
Managing overall TGS Construction activities to provide a complete construction integration program among the various Subcontractors.
Applying a comprehensive knowledge of various disciplines (Civil, Electrical & Instrumentation, Fire & Gas, Mechanical installation of Process Models, Piping and Structural Steel Installation, Pre-Commissioning, Sub System Commissioning, and Full Terminal Gas Facility integration and Commissioning, As-built Documentation and Facility Handover) to be used during construction as well as the methods and techniques to be utilized for construction
Ensure that the Terminal Gas Station construction activities are delivered on Schedule, Budget, Quality without compromising HSE
Review procedures associated with the construction activities and attend constructability and HAZID reviews with PMT/PMC.
Review Construction Equipment needs and requirement and allocate appropriately.
Manage the assignment of construction manpower, materials and equipment in order to maximize efficiency, maintain schedules and to meet budget goals.
Manage the various Subcontractors at worksite locations and ensure that the interfaces amongst various Subcontractors are clearly managed to deliver flawless Terminal Gas Stations
Ensure that a proper Risk Management Framework are put in place to identify, and Manage all Risks associated with project of this nature.
Education and Training
B.Eng. in any Engineering Discipline preferably in Civil or Mechanical Engineering
Strong onshore Gas Facility Construction, Management & Delivery experience
Relevant QHSE Training
Project Management Professional Certified
Experience:
Minimum of 15 years experience in construction of major gas processing stations/Plants projects in the Oil & Gas Construction or Petrochemical industry, and at least 8 years as a Construction Lead/Manager
Proven track record of directly managing a major EPCIC Onshore Gas Pipeline Project
Must have delivered / constructed (from Site preparation to Commissioning and Hand over) of at least two (2) Gas Treatment Plants / Terminal Gas Plants / Gas Metering Stations having at least 500 MMSCFD processing capacity content.