Senior Production Technologist at Hobark International Limited (HIL)

Job Overview

Location
Lagos, Lagos
Job Type
Full Time
Date Posted
3 years ago

Additional Details

Job ID
19332
Job Views
102

Job Description



Job Description



  • Lead Well performance modelling, sand prediction, sand control selection and upper completion design, perforating and smart well design for land and swamp operations.

  • Work in an integrated study team (as a member or a study team lead) to mature opportunities.

  • Make PT input into field development plan.

  • The goal is to extract hydrocarbon optimally and profitably from the Assets.

  • Ensure compliance with well, reservoir and facility management, well integrity, control guidelines and taking appropriate actions in assigned field/s. This is to safeguard the assets and assure reputation of the company.

  • Identification of short term oil opportunities for ranking in the business planning processes and the maturation of short term oil opportunities within the asset team.

  • Ensure flow assurance for the life cycle of the completed wells. Incorporate mitigation strategies into production optimization plans.

  • Identify candidate wells, which have near wellbore or wellbore damage for stimulations (e.g. acid or hydraulic stimulations) and design suitable treatment. Monitor the stimulations operations and evaluate the results.

  • Identify water or gas shut off candidates wells and design treatments (mechanical and chemical treatments).

  • Monitor operations and evaluate results.

  • Identify wells that require additional and/or re-perforations, due to high mechanical skin and design operations (e.g. gun selection, drawdown). Monitor operations and evaluate results.

  • Generate an activity proposal for any of the above operations, which contains the economic justification functional design and programme outline.

  • Generate well/system model (incl. the artificial lift) to compare actual performance with predicted.

  • Identify wells that are not optimized and initiate actions/well interventions to change the operating conditions.

  • Identify wells that are not performing and review options to improve inflow performance.

  • Generate a well/reservoir surveillance plan, in conjunction with other disciplines, obtain key data and incorporate it into asset surveillance plan.

  • Identify candidates for BHPs, production logging & related cased hole logs and design the operation.

  • Monitor operations and evaluate results.


Requirements



  • As a Senior Production Technologist, incumbent should have a broad understanding of other E&P disciplines and skills in all key Production technologist specialties.

  • A University Degree in Engineering or equivalent with 9 - 11 years relevant experience, including a minimum of 9 years PT work experience in an operating company.


Skills in the following;



  • Well Modeling & Performance.

  • Production System Optimization.

  • Conformance Technology.

  • Well Integrity Management and Determining Well Operating Envelope.

  • Planning & Design of Well Intervention Activities.

  • HSE considerations in well management and completion operations.

  • Completion Design and supervision.

  • Oil well cementing and Drill-in Fluids.

  • Knowledge in Production Operation.

  • Coaching/Mentoring.


Similar Jobs

Cookies

This website uses cookies to ensure you get the best experience on our website. Cookie Policy

Accept